



What does an epoxy floor provide?
Bare concrete dusts, absorbs oil and chemicals, breaks at the joints and is hard to clean. Epoxy coating forms a continuous protective layer over the concrete. It protects against physical and chemical attack and gives a far more durable, jointless and easy-to-clean surface than plain concrete.
If the floor is damaged we repair it first and then coat it, so you do not need a separate contractor for each job.
What we apply
- Epoxy floor coating
- Floor and surface painting
- Walkway and safety marking
- Structural steel and tank painting
How is the coating system selected?
- Traffic load: pedestrians, pallet trucks or forklifts? How heavy and how often?
- Chemical exposure: oil, fuel, acids, cleaning chemicals or process liquids on the floor?
- Existing floor: new or old concrete? Cracks, settlement, oil-soaked areas or an old coating?
- Conditions of use: wet areas, slip resistance, hygiene requirements?
Application stages
The life of an epoxy coating depends more on the preparation of the surface beneath it than on the coating itself.
- Survey: we inspect the floor, the area and the conditions of use on site.
- Floor repair: we repair settlement, worn areas and damaged joints.
- Surface preparation: we clean and prepare the surface so that the coating will bond.
- Coating: we apply the selected system in coats.
- Marking and handover: we carry out walkway and safety marking and hand over a clean site.
The waiting time before the floor can be walked on and opened to vehicles depends on the product and ambient conditions. We state it clearly in the quotation and schedule.
Flooring in a working plant
Floor coating requires the area to be closed temporarily. We divide the job into sections and set the working and shutdown periods in line with the plant's production plan. Weekends, public holidays and planned shutdowns are often the best time.
What we need for a quotation
- Area to be coated (m²) and its use
- Vehicles on the floor and their approximate loads
- Chemicals spilled on the floor, if any
- Photographs of the existing floor
- Days the area can be closed and target date
Completed work
To protect our clients' confidentiality we do not name them; completion certificates are shared one to one on request.
1,500 m² covered car park construction
We built the 1,500 m² covered car park of an industrial plant as a contractor. The job covered car park construction, drainage and surfacing works.
- Site preparation and excavation
- Steel mesh, concrete pour, surface finishing and joint cutting
- Removal of the existing canopy and erection of a new car park canopy
- Automatic gate, personnel gate, perimeter fence, mirrors and signs
- Car park floor painting
Completed and handed over within the agreed time and terms.
Frequently asked questions
How does an epoxy floor differ from plain concrete?
It protects concrete against physical and chemical attack and gives a far more durable, jointless and easy-to-clean surface.
Can epoxy be applied to a damaged or cracked floor?
The floor is repaired first. We carry out settlement correction, worn-area repair and joint repair before coating.
How is the coating system chosen?
According to traffic load, chemical exposure and the condition of the existing floor, which is why we survey before quoting.
Does production stop during application?
The area being coated has to be closed temporarily. We work in sections and agree the periods with your production plan.
Do you do walkway and safety marking?
Yes, it is part of our epoxy flooring and painting work.
Do you also paint structural steel and tanks?
Yes, and where needed we carry out the blasting beforehand as well.

